Complete roofing cycle

The entire roof - from trusses to gutters

We design and manufacture roof trusses and install the entire rest of the roof - membrane, battens, covering and rainwater gutter system. One responsible partner for the whole roof means fewer uncertainties on site and a predictable result.

5 layersone cycle
1 contractone responsibility
1 warrantyfor the whole roof
Layer 01 / 05
Trusses Render goes here - frame-01…frame-05
Switch layers →
01 · Trusses
Load-bearing structure
We design and manufacture timber trusses - the load-bearing frame of the roof that takes on all the loads. Calculated with MiTek / PAMIR software.
01 · Positioning

One partner for the whole roof - from the load-bearing truss to the last gutter

Traditionally, several companies are involved in building a roof: one designs the trusses, another installs them, a third lays the covering. At each stage delays and unclear responsibility arise.

Tenter offers a full roof cycle - we design and manufacture the trusses ourselves and install the remaining layers according to your building design. The whole roof from one responsible hand, a predictable result.

Traditionally · 5 separate contractors
Structural engineer Truss manufacturer Truss installer Covering supplier Installation crew
When the solution isn't right - who is responsible? Responsibility dissolves among those involved.
Tenter · one cycle
Designs· Manufactures· Installs
One partner, one responsibility. The entire roof cycle under one contract and one warranty - no one else to point to.
01

one responsibility

One contract, one point of contact and one warranty for the whole roof - without responsibility being shifted between subcontractors.

02

One contractor for the cycle

We design and manufacture the trusses ourselves; the remaining layers we install according to your building design. The whole roof from one hand.

03

Faster construction

Coordinated logistics and a single team reduce downtime on site - the roof is built without waiting between stages.

02 · Reference project

From 3D model to finished roof

One project, the whole cycle - how it looks in the model, on site and from the air.

Completed · drone photo Pabeigtais jumts - drona foto
3D modelis 3D model
Montāžas posms Installation
Montāžas posms Installation
Project data
Roof area200.6 m²
Roof typeHip roof with dormers · 20°
Structure78 elements (C24 + GL24h)
Connectors882 MiTek plates
Installation time4 days
In this project
MembraneSUPERNOVA 180 g
Battens25×100, spacing 300 mm
CoveringMetal profile RR23
Gutter systemKROP d=125 / d=90
LoadsSnow 1500 · wind 705 N/m²

Materials are tailored to each project individually.

03 · Technical reliability

Certified engineering, proven in practice

100+
completed projects
up to 35 m
max. truss span
60 mo.
warranty on structures
Technical parameters
TimberC24 + GL24h
ConnectorsMiTek plates
Max. spanup to 35 m
DesignEurocode - Latvia (PAMIR)
LoadsCalculated for each project
Certificates and partners
04 · Get a quote

Get a quote for the full roof cycle

Fill in the request - our team will contact you and prepare an approximate estimate for the roof cycle. Transparent pricing, no hidden surcharges.

  • Reply within 1-2 business days
  • Free consultation and site visit
  • A price for the whole roof, not for separate stages
Full roof cycle
Tenter Latvija, SIA

Ražošana: Smiltenes iela 11, Rauna

Birojs: Vienības gatve 109, Rīga

+371 26 488 026
+371 29 399 688

info@tenter.Latvian
Tenter 2025 | PVN MAKS. NR.: LV40203257311 | Reģistrācijas numurs: 40203257311
Call

Get an offer

Fill out the form, and we will contact you shortly.
Standard Request